Texas Instruments TS5MP646EVM Evaluation Module

Texas Instruments TS5MP646EVM Evaluation Module is designed to quickly and easily demonstrate the TS5MP646. The TS5MP646 is a 2:1 SPDT multiplexer switch. The TS5MP646EVM facilities ease of use requiring only one 3.3V supply. The device's control logic is toggled using 100mil jumpers. The TS5MP646EVM allows quick DC testing of TI's MIPI switches provided by test points for each pin.

Features

  • Quick DC testing of TI's MIPI switches
  • Demonstrates powered off protection feature
  • Showcases low power disable mode
  • Capable of 1.8 V logic control

Layout

Location Circuit - Texas Instruments TS5MP646EVM Evaluation Module
Publicerad: 2018-11-15 | Uppdaterad: 2023-07-21