Texas Instruments TPSM82903EVM Evaluation Module
Texas Instruments TPSM82903EVM Evaluation Module implements the evaluation of the TPSM82903 buck converter module in a small 3mm by 2.8mm MicroSiP™ package with an integrated inductor. The TPSM82903 is a high-efficiency, low IQ buck converter module for use in various industrial, enterprise, and personal electronics applications or any application with a 12V input voltage or a 1-cell to a 4-cell lithium battery pack.The TI TPSM82903EVM evaluation module provides an output voltage of 1.2V from input voltages between 3V and 17V.
Features
- 4µA Iq
- 40mm2 total solution size
- 3V to 17V input voltage range
- 1.2V output voltage
- 3A output current
PCB Layout
Publicerad: 2022-03-29
| Uppdaterad: 2023-02-10
