Texas Instruments TMAG5273EVM Sensor Evaluation Module (EVM)

Texas Instruments TMAG5273EVM Sensor Evaluation Module (EVM) is an easy-to-use platform for evaluating the main features and performance of the TMAG5273. The TMAG5273 is a linear 3D Hall-effect sensor. The evaluation module includes two magnets, a Texas Instruments TMAG5273 daughterboard, and a sensor controller board (SCB) that enables the accompanying GUI (graphical user interface). Also included is a 3D printed rotate and push module to test the common functions of angle measurement and push-button with a single device.

Features

  • An easy-to-use platform for evaluating the main features and performance of the TMAG5273
  • Includes GUI for reading and writing registers as well as viewing and saving measurement results
  • USB powered; no external power supply is required
  • It also includes a 3D printed rotate and push module to test the common functions of angle measurement and push-button with a single device

Kit Contents

  • TMAG5273EVM daughterboard
  • 1/8-inch diameter x 1-inch thick, N42 magnet
  • 3D printed rotate and push module

Board Layout

Mechanical Drawing - Texas Instruments TMAG5273EVM Sensor Evaluation Module (EVM)
Publicerad: 2021-11-10 | Uppdaterad: 2025-03-26