Texas Instruments LM65635EVM Evaluation Module allows users to evaluate the performance and operation of the LM656x5 wide input voltage buck converters. The LM65635EVM is developed to supply a 5V output to a load requiring 3.5A or less. By replacing other versions of the LM656x5 and reconfiguring the board components, the TI LM65635EVM can be used in many different arrangements.Features
- 3V to 65V wide input voltage range
- 5V, 3.3V, and ADJ voltage
- Up to 3.5A output current (LM65635)
- 300kHz to 2.2MHz switching frequency
- Minimized switch node ringing to reduce Electromagnetic Interference (EMI)
- Input transient capability up to 70V
Applications
- Advanced Driver Assistance Systems (ADAS)
- Automotive infotainment and cluster
- Hybrid, electric, and powertrain systems