Texas Instruments DS160PR412-421EVM Evaluation Module

Texas Instruments DS160PR412-421EVM Evaluation Module offers a high-bandwidth platform for evaluating the signal conditioning features of the DS160PR412 and DS160PR421 Quad-Channel PCI Express 4.0 Linear Redrivers. The TI DS160PR412-421EVM Eval Module can be directly plugged into a PCIe slot on a server or PC motherboard using the PCIe Edge connector on the board and paired with a PCIe add-in card using one of the two PCIe connectors on the Evaluation Module.

The two DS160PR412 and two DS160PR421 devices can extend the transmission distance of a PCI-Express® 4.0 16x bus. The DS160PR412-421EVM board can be used for standard compliance testing, performance evaluation, and initial system prototyping.

Features

  • PCIe x16 and PCIe x8 Riser Card with two DS160PR412 and two DS160PR421 4-channel unidirectional linear redrivers operating at rates up to 25Gbps
  • DS160PR412: linear redriver with 1:2 MUX
  • DS160PR421: linear redriver with 2:1 DEMUX
  • Linear equalization for seamless support of link training and PCIe channel extension
  • CTLE boosts up to 18dB at 8GHz
  • Device configuration and MUX selection by pin control, SMBus, or I2C
  • Flow-thru layout with no heat sink required
  • –40°C to 85°C Industrial temperature range

Applications

  • PCI Express Gen 1, 2, 3, and 4
  • High-speed interfaces up to 25Gbps
  • Enterprise server motherboard, workstation
  • Enterprise storage
  • Enterprise add-in card, end-point

Layout

Texas Instruments DS160PR412-421EVM Evaluation Module
Publicerad: 2021-01-05 | Uppdaterad: 2022-03-11